Wednesday, 16 April 2014

Bridge Building - The Construction Phase




Materials:

  • 40 plastic drinking straws
  • 2 m of masking tape
  • Paper for the road bed
Specifications:
  • No longer than 50 cm
  • Must be able to span a gap of 30 cm
  • Two Hot Wheels type toy cars must be able to pass each other
  • Must support two weights of 200g each
  • Must withstand the "wind test"

No comments:

Post a Comment

Note: only a member of this blog may post a comment.